Autumn 2011
Freja is coming along in leaps and bounds. The structural part of the interior is finished and so it is down to the fine detail now, making and hanging doors, fitting draws and tabletops etc. The owners, down in New Zealand, are really excited, all their equipment for sailing and living aboard is arriving, packages and lists of equipment arriving daily! Launch date is set for 6th April, so not long for them to wait now.
Agnes is also out of the water having a refit. The water and fuel tanks have been removed and remade smaller to enable a large double bunk to be built over the top into the aft of the vessel. We still have the galley to redesign and a new large chart table to fit back in.
The boys are going to have a busy winter finishing both boats before the spring. Agnes is due to go back in the water the same weekend as Freja’s launch to make use of the high spring tides to get her back down river again.
